PROJECT LIST OF AIREDALE BRAND PRECISION AIR-CONDITIONER

1.   Bureau Varitas Bangladesh Ltd.,

a.    10 TR Precision Control (Constant Temperature & Humidity Control) type  Air-conditioning system for the Condition Room.(Testing Laboratory)

 

b.    10 TR Precision Control (Constant Temperature & Humidity Control) type  Air-conditioning system for the Condition Room.(Testing Laboratory)

 

c.    6.2 TR Precision Control (Constant Temperature & Humidity Control) type  Air-conditioning system for the Condition Room.(Testing Laboratory)

 

2.   Cosmopolitan Industries (PVT) Limited, Khejur Bagan, BaroAshulia, Savar, Dhaka

3.6 TR Precision Control (Constant Temperature & Humidity Control) type Package Central Air-conditioning system for the Conditioning Room.

 

3.   ARKEY Knit & Dyeing Mills Ltd. at Gazipur

7.8 TR Precision Control (Constant Temperature & Humidity Control) type Package Central Air-conditioning system for the Conditioning Room.

 

4.   ICDDRB Hospital BSL 3 & BSL-2 Lab, Mohakhali, Dhaka

Supply, Installation, Testing and commissioning of HVAC System for the BSL-3 and BSL-2 Lab with precession type air conditioner complete with BMS system.
Capacity :
14.8 Ton DX precession Type Air conditioner – 2 Sets
7.92 Ton DX precession Type Air conditioner – 1 Set

 

5.   International Center for Diarrheal Diseases Research, Bangladesh.

16 TR (5.32 TR X3 Sets)  Precision Control Type Air-conditioning system for the Computer Data Centre

 

6.   Dhaka Medical College Hospital (Burn Unit), Dhaka.

42 TR( 6 TR x 7 Sets) Precision Control (Constant Temperature & Humidity Control) type Package Central Air-conditioning system for OT, ICU & Recovery Unit